In the second hour we started editing the sound. We had to removed all of the diegetic sound from our clips since it was mainly white noise and it made the quality of our film seem poorer. We did however keep the sound of the shower since I had a plan to have the sound of the shower running from the very start of the film, through all the production companies and then into the first shot of the shower head. After this we inserted the music that Carolina had made in a previous lesson which was all we could fit into that hour.
This is our film without the music:
No comments:
Post a Comment